#P7544. [2017年杭电多校]Schedule
[2017年杭电多校]Schedule
Schedule
Problem Description
There are N schedules, the i-th schedule has start time and end time (1 <= i <= N). There are some machines. Each two overlapping schedules cannot be performed in the same machine. For each machine the working time is defined as the difference between and , where time_{end} is time to turn off the machine and is time to turn on the machine. We assume that the machine cannot be turned off between the and the . Print the minimum number K of the machines for performing all schedules, and when only uses K machines, print the minimum sum of all working times.
Input
The first line contains an integer T (1 <= T <= 100), the number of test cases. Each case begins with a line containing one integer N (0 < N <= 100000). Each of the next N lines contains two integers and .
Output
For each test case, print the minimum possible number of machines and the minimum sum of all working times.
Sample Input
1
3
1 3
4 6
2 5
Sample Output
2 8
Source
2017 Multi-University Training Contest - Team 10